โก Power Command Centre
Steel & Tube Industries ยท Namanve ยท Real-time energy and downtime monitoring
๐ด LIVE OUTAGE โ LINE 4 (Heavy Rolling Mill) โ Power cut at 14:22. Now 38 minutes down. Estimated loss so far: UGX 4,750,000. Generator 2 running. Alert sent to Plant Manager.
Live Outage Cost
UGX 4.75M
Line 4 ยท 38 min down
Monthly Outage Cost
UGX 28.4M
14 outages this month
Generator Cost/Month
UGX 18.2M
Diesel + maintenance
Lines Running Now
6/8
2 down ยท 1 on generator
Production Line Status โ Live
โ LiveLive Outage Cost Counter
Revenue lost โ Line 4 outage
UGX 4,750,000
38 min ยท Started 14:22
Cost rate: UGX 125,000 per minute on Line 4
Today's Downtime Log
| Line | Start | End | Duration | Cause | Generator | Cost |
|---|---|---|---|---|---|---|
| Line 4 โ Heavy Rolling | 14:22 | ONGOING | 38+ min | UEDCL outage | Gen 2 On | UGX 4.75M+ |
| Line 2 โ Wire Drawing | 09:14 | 09:47 | 33 min | UEDCL outage | Gen 1 | UGX 3.96M |
| Line 6 โ Tube Forming | 07:30 | 07:52 | 22 min | UEDCL outage | No gen | UGX 1.76M |
Production Lines
Real-time status of all 8 production lines
Log Power Outage
Floor supervisor logs outage in real time. System calculates revenue loss automatically.
โก New Outage Report
Auto-calculated loss
UGX 4,750,000
38 minutes ร UGX 125,000/min
Line Cost Rates
| Line | Product | Cost/min | Cost/hr |
|---|---|---|---|
| Line 1 โ Cold Rolling | Steel sheets | UGX 125K | UGX 7.5M |
| Line 4 โ Heavy Rolling | Steel bars | UGX 125K | UGX 7.5M |
| Line 5 โ Galvanising | GI sheets | UGX 90K | UGX 5.4M |
| Line 2 โ Wire Drawing | Wire rods | UGX 80K | UGX 4.8M |
| Line 6 โ Tube Forming | Steel tubes | UGX 70K | UGX 4.2M |
| Line 3 โ Pipe Extrusion | PVC/Steel pipe | UGX 60K | UGX 3.6M |
โน Cost rates are based on: hourly production capacity ร product selling price รท 60. Includes raw material waste during restart.
Cost Analysis
True cost of power unreliability โ what Ugandan manufacturers can never see without this tool
Outage Revenue Loss
UGX 28.4M
Production stopped ยท May 2025
Generator Diesel Cost
UGX 18.2M
840 litres ยท 14 outages
TOTAL Power Failure Cost
UGX 46.6M
This month alone
Cost by Line โ May 2025
Line 4 โ Heavy RollingUGX 9.8M
Line 1 โ Cold RollingUGX 7.4M
Line 2 โ Wire DrawingUGX 5.2M
Line 5 โ GalvanisingUGX 4.1M
Line 6 โ Tube FormingUGX 1.9M
Annualised Projection
Monthly power failure costUGX 46.6M
Projected annual costUGX 559M
USD equivalent~USD 152,000/year
๐ก A 500KVA solar backup system costs ~USD 80,000. Payback in 6 months. PowerCost data proves the investment case for your MD and board.
Generator Tracker
Monitor fuel, runtime, maintenance schedule and cost per generator
Generator 1 โ 250KVA
FUEL LEVEL
74%
~148 litres remaining
Statusโ Running
Runtime today2h 14min
Fuel used today67 litres
Next serviceIn 12 hrs
Generator 2 โ 500KVA
FUEL LEVEL
38%
~190 litres remaining
Statusโ Active (Line 4)
Runtime today0h 38min
Fuel used today22 litres
Next serviceIn 120 hrs
Generator 3 โ 150KVA
FUEL LEVEL
12%
โ CRITICAL โ refill now
StatusStandby
Runtime today0h
Fuel remaining~18 litres
Est. runtime left~36 min
Monthly Generator Cost Summary
| Generator | Total Runtime | Fuel Used | Diesel Cost | Maintenance | Total Cost |
|---|---|---|---|---|---|
| Generator 1 โ 250KVA | 42 hrs | 840L | UGX 6.3M | UGX 800K | UGX 7.1M |
| Generator 2 โ 500KVA | 28 hrs | 1,120L | UGX 8.4M | UGX 600K | UGX 9.0M |
| Generator 3 โ 150KVA | 14 hrs | 280L | UGX 2.1M | UGX 200K | UGX 2.3M |
| Total | 84 hrs | 2,240L | UGX 16.8M | UGX 1.6M | UGX 18.4M |
Outage Trends
When do outages happen? Which shifts lose most? UEDCL pattern analysis.
Outages by Hour of Day
Most frequent outage times:
06:00โ09:00 (morning peak)6 outages
12:00โ14:00 (midday)4 outages
17:00โ19:00 (evening peak)3 outages
Other times1 outage
๐ก Schedule maintenance-heavy work 09:00โ12:00 and 14:00โ17:00 โ your most reliable power windows.
Monthly Outage Cost Trend
January 2025UGX 18.4M
February 2025UGX 22.1M
March 2025UGX 31.8M
April 2025UGX 24.2M
May 2025 (to date)UGX 46.6M
โ May 2025 is already the worst month on record โ and it's only the 19th.
MD Report
Monthly power reliability report โ ready for Board presentation
โน This report is auto-generated every 1st of the month and emailed to the MD, Plant Manager, and CFO. It includes the UEDCL claim calculation.
Executive Summary โ May 2025
Total outage events14
Total downtime9 hours 14 minutes
Revenue lost (production stopped)UGX 28.4M
Generator cost (diesel + maintenance)UGX 18.2M
TOTAL COST OF POWER UNRELIABILITYUGX 46.6M
UEDCL Compensation Claim
PowerCost automatically compiles your outage log into a formal UEDCL compensation claim. Uganda's Electricity Regulatory Authority allows industrial customers to claim compensation for excessive outages.
Outages exceeding SLA9 of 14
Claim-eligible downtime6 hr 42 min
Estimated claim valueUGX 8.4M
UEDCL Claims
File formal compensation claims against UEDCL for power interruptions exceeding service agreement
๐ก Most manufacturers never file UEDCL claims because they don't have documented proof of outages. PowerCost automatically builds this evidence โ timestamps, duration, affected equipment, and revenue loss โ making claims effortless.
Claim History
| Period | Outages | Total Downtime | Claim Value | Status | Outcome |
|---|---|---|---|---|---|
| April 2025 | 11 | 7h 22min | UGX 6.8M | Filed | Awaiting response |
| March 2025 | 14 | 9h 48min | UGX 9.2M | Settled | UGX 7.4M paid by UEDCL |
| February 2025 | 8 | 4h 12min | UGX 4.1M | Settled | UGX 3.8M paid by UEDCL |
| January 2025 | 6 | 3h 30min | UGX 2.8M | Settled | UGX 2.1M paid by UEDCL |
| Total 2025 | 39 | 24h 52min | UGX 22.9M | UGX 13.3M recovered |